PO-Other Topics

PO-Other Topics


Freight Types

Graphical user interface, applicationDescription automatically generated with medium confidence


Graphical user interface, application, WordDescription automatically generated 

Graphical user interface, text, applicationDescription automatically generated

PD-Prepaid- The Cost is inclusive of the Material & Freight. Hence, freight cost is not accrued separately.

PA-Prepaid ADD-The freight cost is invoiced  separately by the Vendor for the material supplied from their location to ours.

CC-Collect-Vendor will fix a carrier to supply the material to our location, Bill will be raised by the carrier for the transportation of material from Vendor to our location.

CPU-Customer Pick-up- The material will be picked from the vendor to our location by our own transport or by the carrier hired by us.

DF-Stock Transfer-Vendor will not bill for the freight, but will transfer the material to our warehouse.


Transfer Material from one PO to another PO

TextDescription automatically generated 


Graphical user interfaceDescription automatically generated 




    • Related Articles

    • Other -PO

      Other-PO
    • Other Topics

      Release instructions The instructions for the carrier and warehouse are defined for each Release type as default also the disclaimer instructions of carrier and warehouse are entered in this nodule. The instructions will be printed by default in all ...
    • Other Topics

      Release instructions The instructions for the carrier and warehouse are defined for each Release type as default also the disclaimer instructions of carrier and warehouse are entered in this nodule. The instructions will be printed by default in all ...
    • PO-Others

      Others- Purchase Orders PO Type -OTH is selected for purchase of all consumables for shop floor, administration, and other miscellaneous entities.
    • PO-Processing

      Processing-(PRC) PO Type -PRC is selected to keep track of slitting process of the master coil tag of larger width into smaller width coils. The tab PROCESS TAGS in the Purchase Order captures the relevant slit width of the Master Coil into Smaller ...